Preparation of building design documentation for openings in the Small Väinatamm causeway

The main reason for the construction of openings in the Small Väinatamm causeway is to improve the conditions of the Small Väinatamm as a limited-conservation area and habitat.
A TalTech study previously funded by the EIC under the Environment Programme, shows that the openings in the causeway have a positive effect on the water exchange in the strait and on fish migration.
The EIC’s role in the project is to commission building design documentation (at the preliminary design documentation stage) for the construction of the openings in the Small Väinatamm causeway, including a road safety audit and an expert assessment of the project.